Blog - Construction | Page 6 of 12 | SignManager
 

 

Blog

Home / Blog - Construction
Casestudies

Origin Energy

In 2016, Origin engaged SignManager to help with their upcoming rebrand. They had a tight timeframe and needed assistance with the national implementation. SignManager joined forces with Origin’s Branding and Marketing team to add design specification expertise. Origin has a national network of 4 corporate head offices, 42 gas terminals, 6 power stations and 100s of vehicles of various types and scale.

Casestudies

Ruby Tuesday

Ruby Tuesday and SignManager have been working together to rebrand and handle sign maintenance for their 795 restaurants across the USA. This posed quite a challenge, with numerous restaurants in isolated locations, but made possible using SignManager’s large network of approved vendors.

Casestudies

Penske

PENSKE approached SignManager to help rebrand a number of sites to their PENSKE Power Systems branding throughout Australia. It can often be complicated to carry out rebrands across large site networks; which is why we have the systems in place to manage large projects and rebrands.

Casestudies

Keno

Keno asked SignManager to manage the installation of interior and exterior signage at 550 pubs and clubs throughout Victoria, over a period of six weeks.This project involved rebranding 150 sites, as well as introducing Keno signage into a further 400 venues.

1 2 4 5 6 7 8 11 12